Main Subjects = Scheduling
Number of Articles: 17
1. Parallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm

Volume 13, Issue 2, Summer and Autumn 2020, Pages 199-210

Javad Behnamian


2. Presenting a Joint Replenishment-location Model Under all-units Quantity Discount and Solving by Genetic Algorithm and Harmony Search Algorithm

Volume 13, Issue 1, Winter and Spring 2020, Pages 55-66

Reza Abdollahi Sharbabaki; Seyed Hamidreza Pasandideh


3. The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System

Volume 12, Issue 2, Summer and Autumn 2019, Pages 79-92

Javad Rezaeian; Sadegh Hosseini-Kia; Iraj Mahdavi


4. Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling

Volume 12, Issue 2, Summer and Autumn 2019, Pages 107-119

Javad Behnamian


5. Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint

Volume 12, Issue 2, Summer and Autumn 2019, Pages 131-147

Sadigh Raissi; Ramtin Rooeinfar; Vahid Reza Ghezavati


6. Implementing Bounded Linear Programming and Analytical Network Process Fuzzy Models to Motivate Employees: a Case Study

Volume 11, Issue 2, Summer and Autumn 2018, Pages 25-35

Ali Mostafaeipour; Hasan Khademi Zare; Tahere Aliheidari; Ahmad Sedaghat


8. Service Performance Improvement Model: The Case of Teklehaymanot General Hospital

Volume 11, Issue 1, Winter and Spring 2018, Pages 23-33

Eshetie Berhan; Selam Yibeltal; Sisay Geremew


10. Location-Allocation and Scheduling of Inbound and Outbound Trucks in Multiple Cross-Dockings Considering Breakdown Trucks

Volume 11, Issue 1, Winter and Spring 2018, Pages 51-65

javad Behnamian; Seyed Mohammad Taghi Fatemi Ghomi; Fariborz Jolai; Pooya Heidary


11. Effects of Probability Function on the Performance of Stochastic Programming

Volume 11, Issue 1, Winter and Spring 2018, Pages 67-76

Mohammad Ebrahim Karbaschi; Mohammad Reza Banan


12. A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms

Volume 11, Issue 1, Winter and Spring 2018, Pages 77-90

Morteza khakzar Bafruei; Sananz khatibi; Morteza Rahmani


13. A Multi-Objective Mixed-Model Assembly Line Sequencing Problem With Stochastic Operation Time

Volume 11, Issue 1, Winter and Spring 2018, Pages 157-167

Parviz Fattahi; Arezoo Askari


14. Modeling and scheduling no-idle hybrid flow shop problems

Volume 10, Issue 21, Winter and Spring 2017, Pages 59-66

Mehdi Yazdani; Bahman Naderi


15. Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms

Volume 10, Issue 21, Winter and Spring 2017, Pages 79-92

Javad Hasanpour; Mohammad Ghodoosi; Zahra Sadat Hosseini


16. Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Volume 9, Issue 20, Summer and Autumn 2016, Pages 53-60

Md. Sanowar Hossain; Shahed Mahmud; Md. Mosharraf Hossain


17. A Novel Innovative Design Improvement using Value Engineering Technique: a Case Study

Volume 9, Issue 19, Winter and Spring 2016, Pages 25-36

Ali Mostafaeipour