Volume & Issue: Volume 5, Issue 10, Winter and Spring 2012, Pages 1-72 
2. A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Pages 11-18

Behnam Vahdani; Seyed Meysam Mousavi; Morteza Mousakhani; Mani Sharifi; Hassan Hashemi


4. Sensitivity Analysis in the QUALIFLEX and VIKOR Methods

Pages 29-34

Alireza Alinezhad; Nima Esfandiari


7. An Exact Algorithm for the Mode Identity Project Scheduling Problem

Pages 55-63

Behrouz Afshar Nadjafi; Amir Rahimi; Hamid Karimi


8. A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling

Pages 65-72

Esmaeil Najafi; Bahman Naderi; Hassan Sadeghi; Mehdi Yazdani