Author = Vahdani, Behnam
Number of Articles: 6
1. A new analysis of critical paths in mega projects with interval type-2 fuzzy activities by considering time, cost, risk, quality, and safety factors

Articles in Press, Accepted Manuscript, Available Online from 25 October 2021

10.22094/joie.2021.761.1485

Yahya Dorfeshan; Seyed Meysam Mousavi; Behnam Vahdani


2. ELECTRE I-based group decision methodology with risk preferences in an imprecise setting for flexible manufacturing systems

Volume 14, Issue 1, Winter and Spring 2021, Pages 33-47

10.22094/joie.2019.662.1428

Seyed Meysam Mousavi; Hosein Gitinavard; Behnam Vahdani


3. A New Version of Earned Value Analysis for Mega Projects Under Interval-valued Fuzzy Environment

Volume 13, Issue 2, Summer and Autumn 2020, Pages 57-72

10.22094/joie.2016.267

N Moradi; Seyed Meysam Mousavi; Behnam Vahdani


5. An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment

Volume 10, Issue 22, Summer and Autumn 2017, Pages 73-80

10.22094/joie.2017.278

Vahid Mohagheghi; SEYED meysam mousavi; Behnam Vahdani


6. A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Volume 5, Issue 10, Winter and Spring 2012, Pages 11-18

Behnam Vahdani; Seyed Meysam Mousavi; Morteza Mousakhani; Mani Sharifi; Hassan Hashemi