A
-
Access restrictions to machines
Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines [Volume 12, Issue 1, 2019, Pages 63-78]
-
AGV
A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs) [Volume 12, Issue 2, 2019, Pages 121-129]
-
Ant Lion Optimizer
Healthcare Districting Optimization Using Gray Wolf Optimizer and Ant Lion Optimizer Algorithms (case study: South Khorasan Healthcare System in Iran) [Volume 12, Issue 1, 2019, Pages 119-131]
-
Assembly
Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines [Volume 12, Issue 1, 2019, Pages 63-78]
B
-
Basic Metal Industry
Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries [Volume 12, Issue 2, 2019, Pages 21-32]
-
Battery Charging Storage (BCS)
A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs) [Volume 12, Issue 2, 2019, Pages 121-129]
-
Bi-objective model
A Two-dimensional Warranty Model with Consideration of Customer and Manufacturer Objectives Solved with Non-dominated Sorting Genetic Algorithm [Volume 12, Issue 1, 2019, Pages 15-22]
-
Biogeography Based Optimization
Participative Biogeography-Based Optimization [Volume 12, Issue 1, 2019, Pages 79-91]
-
Branch and bound algorithm
An Algorithm Based on Theory of Constraints and Branch and Bound for Solving Integrated Product-Mix-Outsourcing Problem [Volume 12, Issue 1, 2019, Pages 167-172]
-
Budget constraint
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
C
-
Classification
Classification of Streaming Fuzzy DEA Using Self-Organizing Map [Volume 12, Issue 1, 2019, Pages 53-61]
-
Clustering
Using the Hybrid Model for Credit Scoring (Case Study: Credit Clients of microloans, Bank Refah-Kargeran of Zanjan, Iran) [Volume 12, Issue 2, 2019, Pages 65-78]
-
Compromise ranking
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
-
Cost-effective
Application of Failure Mode Effect Analysis (FMEA) for Efficient and Cost-effective Manufacturing: A Case Study at Bahir Dar Textile Share Company, Ethiopia [Volume 12, Issue 1, 2019, Pages 23-29]
-
Credit Scoring
Using the Hybrid Model for Credit Scoring (Case Study: Credit Clients of microloans, Bank Refah-Kargeran of Zanjan, Iran) [Volume 12, Issue 2, 2019, Pages 65-78]
-
Crush force efficiency
Multi-response Optimization of Grooved Circular Tubes Filled with Polyurethane Foam as Energy Absorber [Volume 12, Issue 1, 2019, Pages 133-149]
-
Customer Relationship Management (CRM)
Classifying the Customers of Telecommunication Company in order to Identify Profitable Customers Based on Their First Transaction, Using Decision Tree: A Case Study of System 780 [Volume 12, Issue 2, 2019, Pages 55-63]
-
Customer Satisfaction
A Regret Minimization Approach in Product Portfolio Management with respect to Customers’ Price-sensitivity [Volume 12, Issue 1, 2019, Pages 93-102]
D
-
Data Envelopment Analysis, Mathematical Programming
Classification of Streaming Fuzzy DEA Using Self-Organizing Map [Volume 12, Issue 1, 2019, Pages 53-61]
-
Data mining
Using the Hybrid Model for Credit Scoring (Case Study: Credit Clients of microloans, Bank Refah-Kargeran of Zanjan, Iran) [Volume 12, Issue 2, 2019, Pages 65-78]
-
Death and Birth
Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries [Volume 12, Issue 2, 2019, Pages 21-32]
-
Decision tree
Classifying the Customers of Telecommunication Company in order to Identify Profitable Customers Based on Their First Transaction, Using Decision Tree: A Case Study of System 780 [Volume 12, Issue 2, 2019, Pages 55-63]
-
Design of Experiments
Multi-response Optimization of Grooved Circular Tubes Filled with Polyurethane Foam as Energy Absorber [Volume 12, Issue 1, 2019, Pages 133-149]
-
Distributed permutation flow shops
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops [Volume 12, Issue 1, 2019, Pages 103-117]
-
Districting problem
Healthcare Districting Optimization Using Gray Wolf Optimizer and Ant Lion Optimizer Algorithms (case study: South Khorasan Healthcare System in Iran) [Volume 12, Issue 1, 2019, Pages 119-131]
-
Downtime
Application of Failure Mode Effect Analysis (FMEA) for Efficient and Cost-effective Manufacturing: A Case Study at Bahir Dar Textile Share Company, Ethiopia [Volume 12, Issue 1, 2019, Pages 23-29]
-
Duedate setting
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability [Volume 12, Issue 1, 2019, Pages 1-13]
-
Dynamic pricing approach
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing [Volume 12, Issue 1, 2019, Pages 173-194]
E
-
Electro-Mechanical Equipment
Investigating Water Supply System Electro-Mechanical Equipments Problems: A Case Study of Ethiopia [Volume 12, Issue 2, 2019, Pages 45-54]
-
Euclidean–Hausdorff distance measure
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
F
-
Facility location selection problem
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
-
Failure Mode Effect Analysis
Application of Failure Mode Effect Analysis (FMEA) for Efficient and Cost-effective Manufacturing: A Case Study at Bahir Dar Textile Share Company, Ethiopia [Volume 12, Issue 1, 2019, Pages 23-29]
-
FEM
Fixture Design and Work Piece Deformation Optimization Using the Iterative Simplex Algorithm [Volume 12, Issue 2, 2019, Pages 33-44]
-
Fixed charge Transportation problem
Solving the Fixed Charge Transportation Problem by New Heuristic Approach [Volume 12, Issue 1, 2019, Pages 41-52]
-
Fleet composition
An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows [Volume 12, Issue 1, 2019, Pages 151-165]
-
Flow shop
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System [Volume 12, Issue 2, 2019, Pages 79-92]
-
Fuzzy Mathematical Programming
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing [Volume 12, Issue 1, 2019, Pages 173-194]
G
-
GAMS software
A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs) [Volume 12, Issue 2, 2019, Pages 121-129]
-
Genetic Algorithm
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
-
Green Supply Chain Management
A Game Theoretical Approach to Optimize Policies of Government Under the Cartel of Two Green and Non-green Supply Chains [Volume 12, Issue 2, 2019, Pages 189-197]
-
Grey Wolf Optimizer
Healthcare Districting Optimization Using Gray Wolf Optimizer and Ant Lion Optimizer Algorithms (case study: South Khorasan Healthcare System in Iran) [Volume 12, Issue 1, 2019, Pages 119-131]
-
Grooved tubes
Multi-response Optimization of Grooved Circular Tubes Filled with Polyurethane Foam as Energy Absorber [Volume 12, Issue 1, 2019, Pages 133-149]
-
Group decision-making
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
H
-
Healthcare system
Healthcare Districting Optimization Using Gray Wolf Optimizer and Ant Lion Optimizer Algorithms (case study: South Khorasan Healthcare System in Iran) [Volume 12, Issue 1, 2019, Pages 119-131]
-
Hesitant fuzzy sets
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
-
Heuristic
Solving the Fixed Charge Transportation Problem by New Heuristic Approach [Volume 12, Issue 1, 2019, Pages 41-52]
-
Hierarchical Models
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
-
Hollow Rectangular Work Piece Fixtures
Fixture Design and Work Piece Deformation Optimization Using the Iterative Simplex Algorithm [Volume 12, Issue 2, 2019, Pages 33-44]
-
Hybrid flowshop
Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling [Volume 12, Issue 2, 2019, Pages 107-119]
I
-
Idle time
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System [Volume 12, Issue 2, 2019, Pages 79-92]
-
Implementation
Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries [Volume 12, Issue 2, 2019, Pages 21-32]
-
Information Technology
An Aggregated Supplier Selection Method Based on QFD and TOPSIS (Case Study: A Financial Institution) [Volume 12, Issue 1, 2019, Pages 31-40]
-
Innovative Conceptual Model
Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries [Volume 12, Issue 2, 2019, Pages 21-32]
-
Integer programming
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing [Volume 12, Issue 1, 2019, Pages 173-194]
-
Integrated supply chain network
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing [Volume 12, Issue 1, 2019, Pages 173-194]
-
Iterated dynasearch
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability [Volume 12, Issue 1, 2019, Pages 1-13]
J
-
JIT scheduling
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System [Volume 12, Issue 2, 2019, Pages 79-92]
-
Job shop
Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines [Volume 12, Issue 1, 2019, Pages 63-78]
L
-
Last aggregation
Hierarchical Group Compromise Ranking Methodology Based on Euclidean–Hausdorff Distance Measure Under Uncertainty: An Application to Facility Location Selection Problem [Volume 12, Issue 2, 2019, Pages 93-105]
-
Linearization
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops [Volume 12, Issue 1, 2019, Pages 103-117]
-
Linear Programing simplex Algorithom
Fixture Design and Work Piece Deformation Optimization Using the Iterative Simplex Algorithm [Volume 12, Issue 2, 2019, Pages 33-44]
-
Location-Allocation Problems
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
-
Location-routing problem
An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows [Volume 12, Issue 1, 2019, Pages 151-165]
-
Lot sizing
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops [Volume 12, Issue 1, 2019, Pages 103-117]
-
Lower bound
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability [Volume 12, Issue 1, 2019, Pages 1-13]
M
-
Machine scheduling
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability [Volume 12, Issue 1, 2019, Pages 1-13]
-
MADM
An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem [Volume 12, Issue 2, 2019, Pages 155-178]
-
Maintenance operations
Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines [Volume 12, Issue 1, 2019, Pages 63-78]
-
Make to order
A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization [Volume 12, Issue 2, 2019, Pages 1-20]
-
Manufacturing
Application of Failure Mode Effect Analysis (FMEA) for Efficient and Cost-effective Manufacturing: A Case Study at Bahir Dar Textile Share Company, Ethiopia [Volume 12, Issue 1, 2019, Pages 23-29]
-
Metaheuristic Algorithms
Solving the Fixed Charge Transportation Problem by New Heuristic Approach [Volume 12, Issue 1, 2019, Pages 41-52]
-
Meta-heuristics
Participative Biogeography-Based Optimization [Volume 12, Issue 1, 2019, Pages 79-91]
-
Meta-heuristics
An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem [Volume 12, Issue 2, 2019, Pages 155-178]
-
Migration operator
Participative Biogeography-Based Optimization [Volume 12, Issue 1, 2019, Pages 79-91]
-
Mixed model assembly line
A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization [Volume 12, Issue 2, 2019, Pages 1-20]
-
M/M/m Queuing Model
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
-
Monarch butterfly optimization
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops [Volume 12, Issue 1, 2019, Pages 103-117]
-
Multi-objective programming
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
-
Multiple Criteria Decision Making
An Aggregated Supplier Selection Method Based on QFD and TOPSIS (Case Study: A Financial Institution) [Volume 12, Issue 1, 2019, Pages 31-40]
-
Multi-response optimization
Multi-response Optimization of Grooved Circular Tubes Filled with Polyurethane Foam as Energy Absorber [Volume 12, Issue 1, 2019, Pages 133-149]
-
Multi-skilled resources
An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem [Volume 12, Issue 2, 2019, Pages 155-178]
N
-
NSGA-II
A Two-dimensional Warranty Model with Consideration of Customer and Manufacturer Objectives Solved with Non-dominated Sorting Genetic Algorithm [Volume 12, Issue 1, 2019, Pages 15-22]
-
NSGA-II algorithm
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
O
-
Offshore Oil and gas industry
An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows [Volume 12, Issue 1, 2019, Pages 151-165]
-
Optimization
An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem [Volume 12, Issue 2, 2019, Pages 155-178]
P
-
Particle Swarm Optimization
Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling [Volume 12, Issue 2, 2019, Pages 107-119]
-
Particle Swarm Optimization
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
-
Preemption
The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System [Volume 12, Issue 2, 2019, Pages 79-92]
-
Preventive maintenance
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
-
Price-sensitivity
A Regret Minimization Approach in Product Portfolio Management with respect to Customers’ Price-sensitivity [Volume 12, Issue 1, 2019, Pages 93-102]
-
Priority-based
Solving the Fixed Charge Transportation Problem by New Heuristic Approach [Volume 12, Issue 1, 2019, Pages 41-52]
-
Production Planning and Control
Production Planning and Control Strategies Used as A Gear Train for The Death and Birth of Manufacturing Industries [Volume 12, Issue 2, 2019, Pages 21-32]
-
Product-mix
An Algorithm Based on Theory of Constraints and Branch and Bound for Solving Integrated Product-Mix-Outsourcing Problem [Volume 12, Issue 1, 2019, Pages 167-172]
-
Product portfolio management
A Regret Minimization Approach in Product Portfolio Management with respect to Customers’ Price-sensitivity [Volume 12, Issue 1, 2019, Pages 93-102]
-
Pump Installation, Operation and Maintenance
Investigating Water Supply System Electro-Mechanical Equipments Problems: A Case Study of Ethiopia [Volume 12, Issue 2, 2019, Pages 45-54]
Q
-
Quality Function Deployment
An Aggregated Supplier Selection Method Based on QFD and TOPSIS (Case Study: A Financial Institution) [Volume 12, Issue 1, 2019, Pages 31-40]
-
Quality levels
A Multi-Objective Fuzzy Approach to Closed-Loop Supply Chain Network Design with Regard to Dynamic Pricing [Volume 12, Issue 1, 2019, Pages 173-194]
R
-
RCPSP
An Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem [Volume 12, Issue 2, 2019, Pages 155-178]
-
Regret minimization
A Regret Minimization Approach in Product Portfolio Management with respect to Customers’ Price-sensitivity [Volume 12, Issue 1, 2019, Pages 93-102]
S
-
Scheduling
Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling [Volume 12, Issue 2, 2019, Pages 107-119]
-
Segmentation
Classifying the Customers of Telecommunication Company in order to Identify Profitable Customers Based on Their First Transaction, Using Decision Tree: A Case Study of System 780 [Volume 12, Issue 2, 2019, Pages 55-63]
-
Self-Organizing Map
Classification of Streaming Fuzzy DEA Using Self-Organizing Map [Volume 12, Issue 1, 2019, Pages 53-61]
-
Sequence-dependent
Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling [Volume 12, Issue 2, 2019, Pages 107-119]
-
Sequencing problem
A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization [Volume 12, Issue 2, 2019, Pages 1-20]
-
Simulated Annealing
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
-
Specific energy absorption
Multi-response Optimization of Grooved Circular Tubes Filled with Polyurethane Foam as Energy Absorber [Volume 12, Issue 1, 2019, Pages 133-149]
-
Stackelberg game
A Game Theoretical Approach to Optimize Policies of Government Under the Cartel of Two Green and Non-green Supply Chains [Volume 12, Issue 2, 2019, Pages 189-197]
-
Statistical quality control
Designing Tolerance of Assembled Components Using Weibull Distribution [Volume 12, Issue 2, 2019, Pages 179-188]
-
Stochastic flexible flow shop
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint [Volume 12, Issue 2, 2019, Pages 131-147]
-
Streaming Fuzzy Data
Classification of Streaming Fuzzy DEA Using Self-Organizing Map [Volume 12, Issue 1, 2019, Pages 53-61]
-
Submersible Pump
Investigating Water Supply System Electro-Mechanical Equipments Problems: A Case Study of Ethiopia [Volume 12, Issue 2, 2019, Pages 45-54]
-
Supply Selection
An Aggregated Supplier Selection Method Based on QFD and TOPSIS (Case Study: A Financial Institution) [Volume 12, Issue 1, 2019, Pages 31-40]
-
Supply vessel planning
An Integrated Approach for Facility Location and Supply Vessel Planning with Time Windows [Volume 12, Issue 1, 2019, Pages 151-165]
T
-
Taguchi Method
Developing a New Bi-Objective Functions Model for a Hierarchical Location-Allocation Problem Using the Queuing Theory and Mathematical Programming [Volume 12, Issue 2, 2019, Pages 149-154]
-
Tax rate
A Game Theoretical Approach to Optimize Policies of Government Under the Cartel of Two Green and Non-green Supply Chains [Volume 12, Issue 2, 2019, Pages 189-197]
-
Telecom
Classifying the Customers of Telecommunication Company in order to Identify Profitable Customers Based on Their First Transaction, Using Decision Tree: A Case Study of System 780 [Volume 12, Issue 2, 2019, Pages 55-63]
-
Theory of Constraints
An Algorithm Based on Theory of Constraints and Branch and Bound for Solving Integrated Product-Mix-Outsourcing Problem [Volume 12, Issue 1, 2019, Pages 167-172]
-
Tolerancing
Designing Tolerance of Assembled Components Using Weibull Distribution [Volume 12, Issue 2, 2019, Pages 179-188]
-
TOPSIS
An Aggregated Supplier Selection Method Based on QFD and TOPSIS (Case Study: A Financial Institution) [Volume 12, Issue 1, 2019, Pages 31-40]
-
Two dimensional warranty
A Two-dimensional Warranty Model with Consideration of Customer and Manufacturer Objectives Solved with Non-dominated Sorting Genetic Algorithm [Volume 12, Issue 1, 2019, Pages 15-22]
-
Two-sided assembly line
A Multi-objective Mixed Model Two-sided Assembly Line Sequencing Problem in a Make –To- Order Environment with Customer Order Prioritization [Volume 12, Issue 2, 2019, Pages 1-20]
U
-
Uncertainty
A Regret Minimization Approach in Product Portfolio Management with respect to Customers’ Price-sensitivity [Volume 12, Issue 1, 2019, Pages 93-102]
-
Unexpected unavailability
Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability [Volume 12, Issue 1, 2019, Pages 1-13]
-
UTADIS
Using the Hybrid Model for Credit Scoring (Case Study: Credit Clients of microloans, Bank Refah-Kargeran of Zanjan, Iran) [Volume 12, Issue 2, 2019, Pages 65-78]
W
-
Warranty cost
A Two-dimensional Warranty Model with Consideration of Customer and Manufacturer Objectives Solved with Non-dominated Sorting Genetic Algorithm [Volume 12, Issue 1, 2019, Pages 15-22]
-
Water Cycle Algorithm
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops [Volume 12, Issue 1, 2019, Pages 103-117]
-
Weibull distribution
Designing Tolerance of Assembled Components Using Weibull Distribution [Volume 12, Issue 2, 2019, Pages 179-188]
Your query does not match with any item