Keyword Index

A

  • Artificial Intelligence A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]
  • Attribute weight Sensitivity Analysis of Simple Additive Weighting Method (SAW): The Results of Change in the Weight of One Attribute on the Final Ranking of Alternatives [Volume 2, Issue 4, 2009, Pages 13-18]

B

  • Boolean model Propagation Models and Fitting Them for the Boolean Random Sets [Volume 2, Issue 3, 2009, Pages 45-48]

C

  • Cellular Learning Automata A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem [Volume 2, Issue 4, 2009, Pages 71-78]
  • Controllable processing time Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]
  • Customer Requirement Fuzzy Centroid-Based Method Applied to Customer Requirements Ranking in Diba Fiberglass Company [Volume 2, Issue 4, 2009, Pages 29-36]

D

  • Database A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]
  • Data mining A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]
  • Decision Tree A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]
  • Delivery decision Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness [Volume 2, Issue 4, 2009, Pages 19-27]
  • Diba Fiberglass Company Fuzzy Centroid-Based Method Applied to Customer Requirements Ranking in Diba Fiberglass Company [Volume 2, Issue 4, 2009, Pages 29-36]
  • Dynamic programming Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness [Volume 2, Issue 4, 2009, Pages 19-27]

F

  • Flo shop A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times [Volume 2, Issue 3, 2009, Pages 39-44]
  • Fuzzy Centroid-Based Method Fuzzy Centroid-Based Method Applied to Customer Requirements Ranking in Diba Fiberglass Company [Volume 2, Issue 4, 2009, Pages 29-36]
  • Fuzzy models A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times [Volume 2, Issue 3, 2009, Pages 39-44]
  • Fuzzy Simulation A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount [Volume 2, Issue 3, 2009, Pages 1-13]

G

  • Genetic Algorithm An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking [Volume 2, Issue 4, 2009, Pages 51-58]

H

  • Harmony search A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount [Volume 2, Issue 3, 2009, Pages 1-13]
  • Hybrid flow shop An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking [Volume 2, Issue 4, 2009, Pages 51-58]
  • Hybrid flowshops A Memetic Algorithm for Hybrid Flowshops with Flexible Machine Availability Constraints [Volume 2, Issue 3, 2009, Pages 59-64]

I

  • Industrial Procedures A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]

J

  • Job Shop A New Approach in Job Shop Scheduling: Overlapping Operation [Volume 2, Issue 3, 2009, Pages 25-32]
  • Job Shop A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem [Volume 2, Issue 4, 2009, Pages 71-78]

L

  • Layout Using Markov Chain to Analyze Production Lines Systems with Layout Constraints [Volume 2, Issue 3, 2009, Pages 15-23]
  • Line Balance Using Markov Chain to Analyze Production Lines Systems with Layout Constraints [Volume 2, Issue 3, 2009, Pages 15-23]
  • Local search An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking [Volume 2, Issue 4, 2009, Pages 51-58]

M

  • Makespan A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times [Volume 2, Issue 3, 2009, Pages 39-44]
  • Makespan A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem [Volume 2, Issue 4, 2009, Pages 71-78]
  • Markov Chain Using Markov Chain to Analyze Production Lines Systems with Layout Constraints [Volume 2, Issue 3, 2009, Pages 15-23]
  • Methodology A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]
  • Multi-attribute decision making (MADM) Sensitivity Analysis of Simple Additive Weighting Method (SAW): The Results of Change in the Weight of One Attribute on the Final Ranking of Alternatives [Volume 2, Issue 4, 2009, Pages 13-18]
  • Multi-objective Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]
  • Multi-period Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]
  • Multi-product Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]

N

  • Neural Networks A Proposed Data Mining Methodology and its Application to Industrial Procedures [Volume 2, Issue 4, 2009, Pages 37-50]

O

  • Oil Application of SCOR Model in an Oil- producing Company [Volume 2, Issue 4, 2009, Pages 59-69]
  • Overlapping A New Approach in Job Shop Scheduling: Overlapping Operation [Volume 2, Issue 3, 2009, Pages 25-32]

P

  • Pareto-optimal solutions Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]
  • Poisson point process Propagation Models and Fitting Them for the Boolean Random Sets [Volume 2, Issue 3, 2009, Pages 45-48]
  • Processor blocking An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking [Volume 2, Issue 4, 2009, Pages 51-58]

Q

  • Quality function deployment Fuzzy Centroid-Based Method Applied to Customer Requirements Ranking in Diba Fiberglass Company [Volume 2, Issue 4, 2009, Pages 29-36]
  • Queuing theory Using Markov Chain to Analyze Production Lines Systems with Layout Constraints [Volume 2, Issue 3, 2009, Pages 15-23]

R

  • Rail-way/Cargo train scheduling Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness [Volume 2, Issue 4, 2009, Pages 19-27]
  • Ranking methods Sensitivity Analysis of Simple Additive Weighting Method (SAW): The Results of Change in the Weight of One Attribute on the Final Ranking of Alternatives [Volume 2, Issue 4, 2009, Pages 13-18]

S

  • SAW Technique Sensitivity Analysis of Simple Additive Weighting Method (SAW): The Results of Change in the Weight of One Attribute on the Final Ranking of Alternatives [Volume 2, Issue 4, 2009, Pages 13-18]
  • Scheduling A New Approach in Job Shop Scheduling: Overlapping Operation [Volume 2, Issue 3, 2009, Pages 25-32]
  • Scheduling An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time [Volume 2, Issue 3, 2009, Pages 33-37]
  • Scheduling A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times [Volume 2, Issue 3, 2009, Pages 39-44]
  • Scheduling A Memetic Algorithm for Hybrid Flowshops with Flexible Machine Availability Constraints [Volume 2, Issue 3, 2009, Pages 59-64]
  • Scheduling A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem [Volume 2, Issue 4, 2009, Pages 71-78]
  • SCOR Application of SCOR Model in an Oil- producing Company [Volume 2, Issue 4, 2009, Pages 59-69]
  • Sensitivity analysis Sensitivity Analysis of Simple Additive Weighting Method (SAW): The Results of Change in the Weight of One Attribute on the Final Ranking of Alternatives [Volume 2, Issue 4, 2009, Pages 13-18]
  • Single machine Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem [Volume 2, Issue 4, 2009, Pages 1-11]
  • Single period newsboy problem A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount [Volume 2, Issue 3, 2009, Pages 1-13]
  • Single-Vehicle and Multi-Vehicle Generalized Traveling Salesman Problem New Heuristic Algorithms for Solving Single-Vehicle and Multi-Vehicle Generalized Traveling Salesman Problems (GTSP) [Volume 2, Issue 3, 2009, Pages 49-58]
  • Supply Chain Application of SCOR Model in an Oil- producing Company [Volume 2, Issue 4, 2009, Pages 59-69]

T

  • TOPSIS Application of SCOR Model in an Oil- producing Company [Volume 2, Issue 4, 2009, Pages 59-69]
  • Traveling salesman problem New Heuristic Algorithms for Solving Single-Vehicle and Multi-Vehicle Generalized Traveling Salesman Problems (GTSP) [Volume 2, Issue 3, 2009, Pages 49-58]